Search This Podcast

Showing posts with label Project Control. Show all posts
Showing posts with label Project Control. Show all posts

Saturday, November 15, 2014

#049 - Why should we choose to have less choice?

Everyone likes to have choice. 

No, that's not quite correct. These days people demand choice, especially in the arena of consumer goods and services.

The more choice the better, it would seem - or at least the manufacturers would have you think so, as you try to pick out a new cell phone from the hundreds of similar models available on any given day. 


Fotolia_43362365_XS

But the truth is we don't handle choice all that well. Choice means change and uncertainty - and offering too much choice can literally stop you in your tracks - or make you leave the shop dazed and confused, without buying anything. 

Listen to the podcast or read the full article on Gazza's Corner Blog.   

Tuesday, July 30, 2013

#034 - Too High, Too Fast - Project Asphyxiation

I have, for much of my life, lived close to sea level. Most people don't think too much about altitude, unless they travel a lot, climb mountains, or are professional athletes. If you live near hills or near mountains, you might not even think too much about a hike or drive up a couple thousand feet, or a few hundred metres or even a kilometre in elevation above where you live. You might not even notice it that much, particularly if you are driving. If you are hiking, well - any trouble breathing you may have can usually be blamed on exertion, and that spare tire you may be carrying.

Certainly, hiking in the mountains around Vancouver, Canada, or skiing at Whistler when I was younger, I never had any problems. The base was a couple thousand feet above sea level, and that was no problem at all. Taking the lift up another 3000 feet (900m) or so and skiing back down, perhaps I felt it, but as I was not that confident a skier I had other things on my mind, like avoiding the row of trees up ahead.

There are times, though, where changes in altitude can have a serious impact on you. 

Specifically, the rate of change is a critical factor that can be life-and-death for you - and also for your projects.

Listen to the podcast or read the full article on Gazza's Corner Blog.

Tuesday, July 24, 2012

#021 - Lather, Rinse, Repeat - Why We Need to Re-Plan Projects

Lather, Rinse, Repeat.

You will find these instructions (or some variation) on most shampoo bottles. Why include these instructions in the first place? Does it mean that the shampoo is actually not that good and you need a double dose? Or, could it possibly be they think you are extra dirty and need the extra round of cleaning (which might be kind of insulting)?


Actually, it is neither of those reasons.

The shampoo is not necessarily faulty, nor are you likely that gamey. The reason they put those instructions on the bottle is that they know the secret of doing a job effectively. The first round cleans most of the pollution, grease and dirt out of your hair - the next round does a final pass to make sure your hair is actually clean, and not just "less dirty".

Other two-part solutions abound - floss before you brush your teeth; your teeth will be healthier if you loosen up the stuff that is stuck between your teeth and then brush and rinse it away.

Painting a room? Don't ever believe the "one coat" label on the can or the brush. Every good painter (DIY or professional) knows that you need (at least) two coats for a good finish. One time round is simply not enough, unless you are freshening up the room with the same exact colour within a couple years. But if you change colours, you will need two coats, and possibly a primer/sealer before that to help hide the old colour. And the bigger the colour change between old and new, the more coats you are likely to need to cover it.

Not surprisingly, the same approach applies to Project Planning, however we are not limited to just a second pass; depending on the length of your project you may end up doing multiple rounds of re-planning to make sure that things are going to get done effectively.

Because - as every Project Manager knows, your project plan becomes obsolete the moment you save it or print it out.

Listen to the podcast, or read the full article on Gazza's Corner blog. 

Sunday, July 15, 2012

#020 - Decisions, Decisions...A Theory on the Origin of Writing

Decisions, decisions.

We each make thousands of decisions every day. Some studies have indicated that the number is at least 5,000, and possibly up to 35,000 decisions every day. Most of these are small decisions, done subconsciously, or on auto-pilot.

The conscious decisions we make every day are far fewer - but still easily in the high hundreds. The important decisions are fewer again, depending on the day. Some decisions may not even seem important until later on. But decisions we make, in the thousands, every single day of our lives. Even when you say that you can't make a decision - that is a decision to leave things as they are.


Theory on the Origin of Written Language

Babylonian legal tablet in stone envelope (Source: Wikipedia)

I have a theory about the origin of written language. There are many in-depth philosophical, scientific and scholarly theories and analyses on the origin and stages of writing in its various forms, from proto-writing through the various scripts, hieroglyphs and alphabets.

My theory is not about the how or when of when the various forms of written language were developed as proposed by those theorists. My theory is about why written language was developed in the first place - at any place in the world you like, regardless of the time period, style, method or medium.

So here is my theory, developed over the course of an afternoon, including a short nap:

Written language was developed because of all of the decisions we make.

More specifically, the important decisions.

Listen to the podcast, or read the full article on Gazza's Corner blog.

Sunday, July 1, 2012

#018 - Other People's Money: Managing Project Budgets Effectively

Other People's Money. 


(Image source: Wikipedia)

When you mention these words, some people might think of stock markets, mutual funds, and the 1991 movie by the same name starring Danny DeVito, in which he played a ruthless corporate raider, leading hostile takeovers of other companies using everyone's money but his own. You might then think about recent history and failed banks, brokerage firms and the millions of affected people when their retirement investments shrank or fell to near zero and countless people lost their homes.

Scary, scary stuff.

Well, let's step back from the big scary picture out there. Back to the reality of your project, where you are "in charge". All of that scary stuff does not really apply to you, does it?

Well, unless you have zero control over your project (and you are just watching from the sidelines and not doing your job), it does apply to you. Unless you are Richard Branson or Bill Gates, you are probably not bankrolling this project from your own pocket.

Your entire project is funded by Other People's Money. This may be customer money, corporate internal project money, or the collected money from the bake sale last month.

The Bad News? You are the steward and caretaker of Other People's Money, entrusted to deliver the project outcomes successfully - within scope, on time, and of course - on or under budget.

The Good News? You are the steward and caretaker of Other People's Money, entrusted to deliver the project outcomes successfully - within scope, on time, and of course - on or under budget.




Monday, April 23, 2012

#008 - Project Communications: GVSVCS (Free) Document Change Control System

Every project has documents. Dozens, hundreds, or even more. Some projects may be lucky enough to have an established document management system with version control. But many will not - and what do you do then? Or what if you do, but the client does not have access to the same system? Or you have a version control system - but people don't use it properly and you have a mess?

A very common scenario in the lifetime of any given document is that person (A)  writes a draft, sends it to B,C,D for review, receives feedback from each of them (separately or together), A updates it and the cycle continues until you have the finalized version. And quite often the files are exchanged by email.

Sounds simple, right? Well if you say yes - you have not actually dealt with the very real problem of version control (or change control). It is far too easy to lose updates when someone sends you a file that on the surface "looks like" the same one you had (same file name, mostly looks the same, you cannot see the changes because they were not marked or tracked properly etc). Or you overwrote B's updates with C's file when you saved the attachment. And even worse - if it is not being reviewed closely enough, that might not be caught until it is too late. Sound familiar?

There are many possible solutions to this of course - but I always like to think that simpler is better, because if you make it simple, people might actually use it. There are a lot of very expensive, fancy systems people just don't use - or don't use properly because they are difficult or tedious to work with.

Note that this is not a discussion on the "track changes" features of various document programs, which of course you should be using as well to track the internal updates. This is one level up from that, but just as important.

Listen or read the full article on Gazza's Corner (www.gazzascorner.com)

Gary Nelson, PMP www.gazzaconsulting.com